This project entailed the construction of a new ISO7 cleanroom for pharmaceutical production, within the existing Advance Factory building, located close to the entrance to Boston Scientific Cork, at the eastern end of the plant. The existing building is a single-storey, high bay industrial building dating from approximately 1998. It is a steel frame structure with metal deck roof and prefabricated insulated metal cladding panels. Main building contractor for the project was Ardmac.

To meet the servicing requirements of the new cleanroom, a new utility building was constructed by PJ Hegarty directly adjacent.

Status: Complete