Design and construction of a new MCC and administration building extension to IE8 small molecule production building over 2 phases. The extension will include a range of support accommodation including staff locker rooms, canteen and office area over a number of floors. Works have been undertaken while maintaining production at all times. Materials were selected to match the existing palette including dark green insulated metal panel and aluminium framed windows, doors and louvre screens.
Status: Phase 1 Complete, Phase 2 Design stage